MODIFICATION OF AN EXISTING CONTINUOUS RANGE FROM PRE-TREATMENT LINE TO PAD-STEAM

Background: The customer needs a new overdyeing continuous line because of his current production.

TVE ESCALE Proposal: Transform an existing pre-treatment line from another firm to padsteam.

TVE ESCALE Project: 
1. Installation of a dye pad. 
2.
 Incorporation of an entry unit and an exit unit with mechanical seal to the existing steamer. 
3. Modification of the existing steamer passage. 
4. Installation of a new squeezer pad at the exit of the modified steamer. 
5. Movement of the washing boxes from front to after steamer.


Result: The customer achieves a reliable and robust pad-steam with the minimum investment