MODIFICATION OF AN EXISTING CONTINUOUS RANGE FROM PRE-TREATMENT LINE TO PAD-STEAM
Background: The customer needs a new overdyeing continuous line because of his current production.
TVE ESCALE Proposal: Transform an existing pre-treatment line from another firm to padsteam.
TVE ESCALE Project:
1. Installation of a dye pad.
2. Incorporation of an entry unit and an exit unit with mechanical seal to the existing steamer.
3. Modification of the existing steamer passage.
4. Installation of a new squeezer pad at the exit of the modified steamer.
5. Movement of the washing boxes from front to after steamer.