MODIFICATION OF AN EXISTING CONTINUOUS RANGE FROM PRE-TREATMENT LINE TO WASHING

Background: The customer has an inoperative preparation facility for several reasons.

TVE ESCALE Proposal: Transform the existing line of another firm to an operational washing line.

TVE ESCALE Project: 
1. Removal of the existing inoperative steamer. 
2. Installation of a “ROTOPRESS” washing unit at the entry. 
3. Motorization of the rollers from the existing washing boxes. 
4. Installation of load cells.
5. Modification of the existing foulards installing scroll rolls and bowed expanding rollers. 
6. Substitution of the compensator control systems. 
7. Substitution of all the motors. 
8. New system of PH regulation with a new automatic acid dosage. 
9. Upgrade of the electric installation. 
10. New electrical cabinet, new pneumatic cabinet and new control panel boards.


Result: The client manages to have a new and reliable washing range adapted to his needs